International Task Force with Japanese Supplier
OUR SERVICES
- •Leading and coordinating an international task force
- •Root cause analysis and on-site process optimization
- •Management of immediate and long-term measures
- •Close collaboration with supplier management and the client's specialist departments
PROJECT SCOPE
Ensuring the short-term delivery capability of a critical charger to prevent vehicle losses during the series ramp-up of several model series – with a focus on process stabilization.
THE CHALLENGE
The daily production output at the supplier was significantly below demand and jeopardized the launch of several electric models. Internal production problems and a lack of control capacities required quick, coordinated intervention.
OUR SOLUTION
- •Establishment and leadership of an interdisciplinary on-site task force
- •Execution of a structured root cause analysis in production and logistics
- •Daily operational consulting and control at the site
- •Adjustment and optimization of the production line
- •Initiation of a targeted management change at the supplier
- •Implementation of short-term measures to secure output
- •Introduction of sustainable improvement processes
The Result
Stabilization of daily output to target level
Prevention of vehicle losses due to missing chargers
Significant increase in production efficiency
Sustainable optimization of production processes
Strengthening of supplier control through targeted management change